MoDOT Revises Ramp & Repave Work At Cameron

MoDOT has again rescheduled the ramp closures that were to begin this morning near Cameron.  Repaving on portions off US 36 at Cameron require closing of ramps at US 69 and lane closures was to begin this morning.  Under the revised schedule, MoDOT and their contractor will close Eastbound ramps to and from US 69 starting at 7:00 Wednesday morning.  The exit ramp should be open around 9:00 and the entrance ramp will re-open around 11:00.

 

The resurfacing is from the Caldwell / Dekalb County Line to Grindstone Creek.  The revised schedule for other planned work includes:

  • Thursday, July 26 – Resurfacing the westbound driving lane near Ensign Trace. Access to Ensign Trace on the north side of US 36 will be CLOSED.
  • Friday, July 27 – Resurfacing the eastbound passing lane near Ensign Trace. The median crossover between the eastbound and westbound lanes of US 36 at Ensign Trace will be closed.
  • Saturday, July 28 and Monday the 30th – Resurfacing passing lanes of US 36.
  • Tuesday, July 31 – Resurfacing the westbound passing lane near Ensign Trace. The median crossover between the eastbound and westbound lanes of US 36 at Ensign Trace will be closed.

Leave a Reply

Your email address will not be published.