US 36/65 Ramp Resurfacing Delays

MoDOT Roadwork Scheduled in the Area

The resurfacing of the ramps at US 36 and 65 is delayed again. The contractor working with the Missouri Department of Transportation, resurfaced the westbound off-ramp last week, but were unable to complete the other three ramps at that time. The resurfacing, which was supposed to take place today and Friday, has once again been postponed. With the weather changes […]

Read more

Ramp Closure Updates For Chillicothe

MoDOT Roadwork Scheduled in the Area

MoDOT announced changes to the Ramp Resurfacing in Chillicothe.  The contractor now plans to resurface the four ramps on US 36 at US 65 in Livingston County, one half at a time, instead of closing them as previously announced. The work began today, Wednesday, and continues through Friday, during daylight hours. During the work a 14-foot width restriction will be […]

Read more

Grand River Flooding At Chillicothe

The National Weather Service predicts the Grand River at Chillicothe will reach 35.7 feet for a crest. Floodstage at Chillicothe is 24 feet and the river is currently at 29.1 feet. Historic data from The National Weather Service indicates at 35 feet, Us 65 south of Chillicothe is threatened by floodwaters. Drivers that will need to travel south of Chillicothe […]

Read more

US 65 Bridge Open

The bridge rehabilitation of the US 65 bridge over the Grand River was completed Wednesday and two-way traffic was restored at around noon.  The Missouri Department of Transportation says the work on the project began in March with the realignment and relocation of the access road to the City water treatment plant and the river access. Radmacher Brothers Excavating Co. […]

Read more
1 2 3