MoDOT Road And Bridge Work For The Start Of March

The Missouri Department of Transportation Roadwork season is beginning, with some new projects scheduled and other projects nearing completion.  The roadwork scheduled for March 2nd to the 7th includes:

Carroll County

US 65 – Bridge maintenance at the Shootman Creek and Mound Creek bridges, all week. Temporary traffic signals are in place.

Chariton County

US 24 – Bridge replacement project at the Mussel Fork River and Overflow Bridges west of Keytesville continues through spring 2020. Traffic is being diverted over a one-lane, signalized bypass during the replacement of the Mussel Fork River Overflow Bridge.

US 24 – Bridge replacement project at the Middle Fork Chariton River and Overflow bridges continues through March 2020. Traffic will be directed through the work zone with temporary traffic signals. A 10-foot width restriction is in place.

Daviess County

Route P – CLOSED for a culvert replacement 1 mile east of Route K, Thursday from 7:30 a.m. to 2:30 p.m.

Route 6 – Pothole patching from Route 190 to Route P, Monday

Route 190 – Drainage work southbound from Route B to Granite Avenue, Tuesday

Route B – Drainage work eastbound at 262nd Street, Wednesday

Route 13 – Driveway culvert replacement northbound from Clay Street to Brook Street, Friday

Linn County

Route P – CLOSED for a culvert replacement from Grid Road to Green Hills Road, Tuesday from 7 a.m. to 3:30 p.m.

US 36 – Pothole patching from the Macon County line to Route 139, Monday to Thursday

Livingston County

US 65 – Bridge rehabilitation project over the Grand River through November.

Route 190 – Bridge rehabilitation project over the Thompson River through November.