Search

Stream KCHI Live 24/7!

Area Road Work Week of 8/17/20

The Missouri Department of Transportation road work continues next week, including several on-going projects.
In Livingston County: U.S. Route 65 – Bridge rehabilitation project over the Grand River through mid-December. The bridge will CLOSE from Tuesday Aug. 18 at 1 a.m. through Friday, Aug. 21 at 12 p.m. When the bridge reopens to one-lane traffic on Aug. 21, an 11.5-foot width restriction will be in place. Route C closed from DD to 36, open to local traffic only the 18th to 21st.
Route 190 – Bridge rehabilitation project over the Thompson River. 10-foot width restriction is in place. The bridge rehabilitation project is expected to continue through late November.
In Carroll County: Route Z closed from C to Country Road 217 until further notice due to damage from a roadway slide
Route C closed for culvert replacement at the Branch of Turkey Creek Bridge through early November.
In Chariton County: Route 5 will have pothole patching from Route 24 to WW the 17th and 18th. Route M will have pothole patching from Route 11 to F on August 19th-20th
In Daviess County: resurfacing projects on Route 6 and I-35, plus pothole patching on Route V and Route K from B to P the 17th and 18th. Shoulder Work on Route 69 from the 19th to 21st, Scrub Seal project on 190 from the County Line to Route F on the 20th and 21st, and drainage work on Route F from Route 6 to 190 on the 20th and 21st.
Grundy County Route 6 sidewalk and utility work from 4th to Muddy Creek Bridge through August, including Saturdays. Resurfacing Project on Route 5 from Muddy Creek Bridge to I-35 in Daviess County through early September.
Also a Scrub Seal Project on Route 128 from the 18th to the 19th.
Sullivan County: Route N closed for culvert replacement west of Route B near Green City through September, Route PP closed for bridge replacement over East Medicine Creek through the end of the year. Route KK pothole patching from Route EE to Route K in Putnam County the 17th to 18th. Route YY pothole patching the 17th to 20th and Route EE pothole patching from KK to K Aug 19-20th.