Road work in the area will resume next week by the Missouri Department of Transportation.
Livingston County-Bridge maintenance on 190 at the Thompson River Bridge through mid-May with a 12-foot width restriction.
Route 36 will have paving and pavement repair through Caldwell, Livingston, and Linn Counties through mid-June with intermittent lane closures with a 14-foot width restriction.
Carroll County – Route Z is closed until further notice from C to Road 217 due to damage caused by a roadway slide and ongoing geological studies.
Caldwell County – Pothole Patching on Route U from the 21st to 23rd.
Chariton County -Route 139 closed for bridge replacement at the Grand River Overflow Bridge through July. Route 129 closed for a culvert replacement from Salt Lick Avenue to Philpott Avenue on April 20th from 8:00 am to 3:00 pm. Route 11 will have bridge maintenance at the Salt Creek Bridge south of Route BB April 20 to 23rd with temporary traffic signals in place to guide motorists.
Linn County – Route WW closed for bridge maintenance at the Mussel Fork Bridge April 19th, 7:00 am through April 20th at 10:00 am.
Grundy County – Route C closed for a culvert replacement from Northwest 12th Street to North 2nd Street in Spickard April 19th, 7:00 am to 3:30 pm.
US Route 65 and Route 6 will have roadside spraying April 19 – 23rd. Route A closed for a culvert replacement from Northwest 23rd Ave to Northwest 28th Ave on April 20th from 7:0 am to 3:30 pm. Route W drainage work on April 22nd.
Sullivan County -Route PP closed for a bridge replacement project over East Medicine Creek through late April.