Search

Stream KCHI Live 24/7!

MoDOT Roadwork Projects For The Beginning Of May

The Missouri Department of Transportation has numerous roadwork projects scheduled for the northwest part of the state.  Some of the projects include pothole patching and roadside work.

In the local counties, the work includes:

Caldwell County

US 36 – Resurfacing project eastbound from the DeKalb County line to Hamilton through mid-June.

Interstate 35 – Resurfacing project from just north of Exit 52 in Cameron (Clinton County) to US 69 (Daviess County), May 4 through mid-August.

Carroll County

Route Z – remains CLOSED until further notice from Route C to County Road 217 due to damage caused by a roadway slide.

Route 139 – CLOSED for a bridge rehabilitation project at the Hurricane Creek Bridge through mid-June.

Daviess County

Route Z – CLOSED for a bridge rehabilitation project at the Sampson Creek Bridge, west of Pattonsburg through mid-June.

I-35 – Bridge painting project between mile markers 66.8 and 81.2 through May

I-35 – Resurfacing project from the US 69 to just north of Exit 52 in Cameron (Clinton County), May 4 thru mid-August.

Grundy County

Route 6 – CLOSED westbound just west of the Thompson River Bridge, due to deterioration surface conditions, through May 6. The road will be narrowed around-the-clock with temporary traffic signals to guide motorists through the work zone. A 12-foot width restriction is in place.

Linn County

Route 139 – CLOSED for a bridge replacement project at the Lewis Creek Bridge, through early June

Livingston County

Route C – CLOSED until further notice at the Shoal Creek Bridge, due to deterioration

Sullivan County

Route K – Resurfacing project from Route E to US 136  May 2 – 6. A 10-foot width restriction is in place

Route T – Resurfacing project from Route 5 to Route C, May 2 – 6. A 10-foot width restriction is in place

Route Z – CLOSED for a culvert replacement from Vista Road to Vernon Road, May 3, 7 a.m. to 2 p.m.

Route DD – CLOSED for a culvert replacement from Walnut Road to Violet Road, May 4, 7 a.m. to 10 a.m.

Route DD – CLOSED for a culvert replacement from Violet Road to Vermont Road, May 4, 10 a.m. to 2 p.m.