The Route V Bridge at Miami Station re-opened Tuesday. The Missouri Department of Transportation says the bridge located approximately 2.5 miles south of US 24, re-opened after the bridge replacement project. The Missouri Department of Transportation contracted with Gene Haile Excavating, Inc. to replace the bridge with a box culvert.
Crews closed Route V to all traffic at the bridge on May 16th and were able to reopen the roadway four days ahead of the deadline. The cost of the project was $359,816.25.