Search

Stream KCHI Live 24/7!

Bridge Clearance Reduced During Lane Reconstruction

US Highway 36 bridge clearance under the US 65 bridge in Chillicothe will be lowered temporarily, beginning June 17th.  Contractors are completing concrete repairs under the bridge and beginning the 17th the clearance will be lowered to 14 feet 6 inches.  This will continue through July 12th.

Vehicles requiring clearance greater than 14 feet 6 inches will need to use the exit and entrance ramps to avoid going under the bridge.