Two engineering services contracts were approved by the Chillicothe City Council Monday. City Administrator Roze Frampton explains the first contract with Allgeier Martin.
Audio PlayerStandard retainer for basic engineering services.
Frampton says the second contract is an addendum to the first and is for a stormwater drainage project.
Audio PlayerEngineering for a specific project – in an alley.
The addendum is all-inclusive.
Audio PlayerFrom design to bidding, and construction.
The total on the engineering for the stormwater project is not to exceed $183,000.