The MoDOT Roadwork schedule for the area counties includes bridge projects, resurfacing, pothole repairs, and culvert replacements. The projects in the local counties include:
Caldwell County
US 36 – Resurfacing project in the westbound lanes only from the Livingston County line to Route 13 through April. This includes a 14-foot width restriction.
Carroll County
US 65 – Bridge rehabilitation 2 miles north of the Missouri River through mid-May. Traffic will be narrowed to one lane with a 17-foot width restriction and temporary signals are in place to guide motorists through the work zone.
Route HH – CLOSED for a culvert replacement from County Road 341 to County Road 351, Monday
Route P – CLOSED for a culvert replacement from County Road 214 to County Road 220, Tuesday
Route 139 – CLOSED for a culvert replacement from County Road 210 to County Road 220, Wednesday
Chariton County
US 24 – Bridge replacement project at the Mussel Fork River and Overflow bridges west of Keytesville through April. Temporary traffic signals are in place to guide motorists through the work zone.
Daviess County
Route C – CLOSED for a culvert replacement from 185th Street to Elmwood Avenue, Tuesday.
Grundy County
Route Z – Resurfacing project from Route 6 to US 65 through late-April. This includes a 10-foot width restriction.
Linn County
US 36 – Concrete replacement from Route 11 to Route F, Monday to Wednesday
US 36 – Concrete replacement from Route F to Route 5, Wednesday to Friday
Livingston County
US 65 – Bridge rehabilitation project over the Grand River through November. An 11.5-foot width restriction is in place.
Route 190 – Bridge rehabilitation project over the Thompson River through November. A 10-foot width restriction is in place.
US 65 – Bridge maintenance at the Shoal Creek Overflow Bridge, Monday to Thursday
Sullivan County
Route PP – CLOSED for a bridge replacement project at the East Medicine Creek Bridge through early July.