The Missouri Department of Transportation has a variety of roadwork projects scheduled for next week. They include bridgework, pavement repairs and pothole patching. Work in the local counties includes:
Livingston County
US 65 – Bridge rehabilitation project over the Grand River through late November.
Route 190 – Bridge rehabilitation project over the Thompson River through late November.
Route D – Bridge maintenance from Route DD to Route W
US 65 – Bridge maintenance at US 36,
Caldwell County
US 36 – Resurfacing project in the westbound lanes from the Livingston County line to Route 13 through June. This includes a 14-foot width restriction.
Carroll County
US 65 – Bridge rehabilitation project 2 miles north of the Missouri River. The contractor plans to have the bridge open to two-way traffic by May 22.
US 65 – Bridge rehabilitation project 0.5 miles north of Route 10 at the Wakenda Creek Bridge. The contractor plans to have the bridge open to two-way traffic by May 22.
Chariton County
US 24 – Bridge replacement project at the Mussel Fork River and Overflow bridges west of Keytesville through May.
Pavement Repairs
Route 5 from Route WW to Route KK, Route KK from Route 5 to US 24, and Route WW from Route 5 to Route KK.
Daviess County
Route E – CLOSED for a culvert replacement from US 69 to 135th Street, May 21, 7 a.m. to 2 p.m.
Route RA – Culvert repair 0.2 miles west of Route 190, May 20
Grundy County
Route 6 – Sidewalk and utility work from 4th Street to Muddy Creek Bridge in Trenton.
Linn County
US 36 – Bridge maintenance from Route 139 to the Livingston County line, May 18 – 19
US 36 – Concrete replacement from Higgins Ditch to Route 139, May 18 – 22
Sullivan County
Route PP – CLOSED for a bridge replacement project at the East Medicine Creek.
Route UU – CLOSED for a culvert replacement from Valley Road to Wizard Road, May 18