The Missouri Department of Transportation has numerous planned roadwork projects in Northwest Missouri. Some of those projects may include moving operations, such as mowing, brush cutting, and litter removal. In addition to several bridge and bridge deck replacements, scheduled work includes:
Caldwell County
Route B – CLOSED daily for a resurfacing project from Route F to Southeast Price Drive, Sept. 28-Oct. 2.
Route U – CLOSED daily for a resurfacing project from Route 13 to Route K, Sept. 28-Oct. 2.
Carroll County
Route D – ADA sidewalk improvements project in Norborne, through October.
Grundy County
Route WW – CLOSED daily for resurfacing project from Route 6 to Route W, Sept. 28-Oct. 2.
Route W – CLOSED daily for resurfacing project from Route 6 to County Road 500, Sept. 28-Oct. 2.
Route JJ – Pothole patching, Sept. 28-Oct. 2.
Linn County
US 36 – Concrete replacement westbound from Katy Drive to Route F, Sept. 28-30. The roadway will be narrowed to one lane around the clock.
US 36 – Concrete replacement westbound from Route F to Jade Drive, Sept. 30-Oct. 2. The roadway will be narrowed to one lane around the clock.
Route B – CLOSED daily for a resurfacing project from US 36 in Wheeling to Route 5 in Linneus, Sept. 24-30.
Route 139 and O – Scrub seal project throughout Linn and Sullivan counties through October.
Sullivan County
Routes E, W & PP – Resurfacing project Sept. 28-30.
Routes M, 139 and O – Scrub seal project throughout Linn and Sullivan counties through October.