The electric Generation Study was presented to the Chillicothe Board of Public Works and that study will help determine the direction of equipment needed by CMU. General Manager Jim Gillilan says they had been waiting on this study before replacing a generator that is not working.
Gillilian says with the data received, the board and staff will determine the direction on replacing that generator.