Today's News... Yesterday's Music

Today's News... Yesterday's Music

MoDOT Announces Planned Roadwork for August

The Missouri Department of Transportation has several roadwork projects for the first week of August.  In the local counties, that includes:

 

Livingston County

US 65 – Resurfacing project from US 36 in Chillicothe to south of Route CC near Carrollton, through October. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone.

US 36 – Pavement repair project, all week. A single lane may be closed in up to two-mile sections, around the clock. A 12-foot width restriction will be in place.

Route A – CLOSED in up to 2-mile sections for a resurfacing project, Aug 8-14.

 

Caldwell County

Route D – CLOSED for a bridge replacement project at the Shoal Creek Bridge through September 2025.

Route 116 – Pavement repair from Route T to the city limits of Polo, Aug. 4-7.

Route CC – Resurfacing project, Aug. 4-9.

Route M – CLOSED in up to 2-mile sections for a resurfacing project, through Aug. 4-9.

US 36 – Pavement repair project, Aug. 4-9. A single lane may be closed in up to two-mile sections, around the clock. A 12-foot width restriction will be in place.

 

Carroll County

US 65 – Resurfacing project from US 36 in Chillicothe to south of Route CC near Carrollton, through October. The roadway will be narrowed to one lane with flaggers directing motorists through the work zone.

 

Chariton County

Route PP – CLOSED at the Mid-Fork Chariton River Bridge due to deterioration.

US 24 – Bridge maintenance at the bridge over Grand River, Monday – Thursday. The bridge will be narrowed to one lane daily from 9 a.m. to 2 p.m. with temporary traffic signals.

 

Daviess County

Route 6 – CLOSED for a bridge deck replacement project at the bridge over I-35 (Exit 64) through early September 2025.

  • Interstate 35 – CLOSED both directions beneath the Route 6 bridge (Exit 64) during bridge deck pour, Thursday and Friday, 7 p.m. – 6 a.m. I-35 traffic will be directed up and over the on/off ramps.

Route 190 – CLOSED for a bridge replacement project at the Clear Creek Bridge, north of Lock Springs, through mid-November 2025.

Route CC – Resurfacing project, all week.

Route M – CLOSED in up to 2-mile sections for a resurfacing project, All week.

 

Linn County

US 36 – Pavement repair project, all week

Sports

June 13, 2026

Mudcats and Merchants Suspended After Three Innings Due To Rain

Sports

June 12, 2026

Mudcats Lose A Close One To The Merchants; Fall to 1-8

News

June 12, 2026

Primary Election Approaching

News

June 12, 2026

Hughes Sentencing

News

June 12, 2026

Bennett Plea Change to Guilty