MoDOT Scheduled Roadwork For Local Counties

The Missouri Department of Transportation roadwork plans for the start of August.  In the local counties, the work includes:

Caldwell County

Route 13 – CLOSED from Mill Creek Drive to Route P for the first stage of a resurfacing project from the south city limits of Hamilton to just north of Route HH in Kingston through December 2023. The project will be broken up into three stages with a signed detour in place.

Route 13 – CLOSED for a bridge replacement project at the Route 13 bridge over U.S. Route 36 in Hamilton through early August.

Carroll County

U.S. Route 24 – Bridge rehabilitation projects:

  • S. Route 24 over BNSF Railroad just east of the U.S. Route 65 interchange through August.
  • S. Route 24 over Little Wakenda Creek east of Carrollton through August.

Chariton County

Route D – CLOSED for a bridge replacement project at the Clarks Creek Bridge through mid-October.

Route P – Pavement repairs from the Macon County Line to Falcon Road, July 31 – Aug. 3. A 12-foot width restriction will be in place.

Grundy County

Route 6 – Intersection improvement project at Routes 146 and W through early October. Traffic will be narrowed to one lane with temporary traffic signals directing motorists. Access to/from Route W will be closed. A 12-foot width restriction is in place.

Route A – CLOSED in 2-mile segments for a resurfacing project from U.S. Route 136 (Mercer County) to U.S. Route 65 through Aug 2.

Linn County

Route MM – Sidewalk improvements from 7th Street (Route MM) to Alonzo Avenue (Route O) through mid-August.

Livingston County

Route D – CLOSED until further notice at the Rattlesnake Creek Bridge due to deterioration.

Route C – CLOSED for a bridge replacement project at the bridge over Shoal Creek, north of Route DD, through August.

Sullivan County

Route C – CLOSED for a bridge replacement project at the Yellow Creek Bridge, 1.5 miles east of Route U, southeast of Milan, through September.

Route 5 – Intersection improvement project at Mid-Lake Road, Route N and Mayapple Road through early October.

  • July 31 – October: Intersection improvements at Route 5 and Mid-Lake Road.
    • Traffic Impacts: Roadway will be narrowed to one-lane with flaggers directing motorists through the work zone. Motorists may face travel delays.
  • Aug. 7 – Oct. 2: Intersection improvements on Route 5 at the intersections of Route N and Mayapple Road.
    • Traffic Impacts: Roadway will be CLOSED during construction. Motorists will be directed to follow the signed detour on Routes 6, J, Y, N, and B.

 

Sports

December 4, 2025

Lady Hornets Claim Savannah Tournament Crown with Comeback Effort Over Savages

Sports

December 4, 2025

Hornets Unable to Hold on Against Platte County

News

December 4, 2025

Chillicothe Police Report For Wednesday

News

December 4, 2025

Main Street Chillicothe – Kids’ Christmas

News

December 4, 2025

At The Museum – Holiday Sing-Along