The Livingston County Health Center Board of Trustees approved the replacement of the HVAC systems for the building. Director Katie Stephens says the board received only one bid for the work from Fosters. The bid includes pricing per unit. The board chose to replace the entire system that was installed in the 1990’s. The cost of the five systems totals just over $44,600 for five units.
Stephens will be contacting them, and she hopes to get the work started as soon as possible.